Showing posts with label cabinetry. Show all posts
Showing posts with label cabinetry. Show all posts
Tuesday, May 29, 2012
Picking Granite for Your Kitchen Remodel
Wednesday, August 22, 2007
August 21, 2007 Busy Meeting
Beverly met with me today and we accomplished so many things!
1. Selected exterior housing color
2. Selected exterior lighting fixtures
3. Went over the detailed plans for the children's bath and noted any final changes. We are making sure the soffit is redrawn at the correct height. Additionally, we want to verify the trim in the shower matches the height of the backsplash over the sink. We added an outlet to the new storage area for a radio. We changed the light switch order to first position are the CFL lights(sconces and shower). Second position are the incandescent downlights. The third position is the fan. 4. We reviewed the countertop material. Beverly had a nice composite stone countertop in a color called coffee bean which we will use in place of the marble.
5. We discussed the entry door. We decided to use stained wood and selected a nice stain color.
6. We selected two drawer and door fronts for the cabinetry in the children's bath. Bev with send these cabinets out for bids.
7. We added the shampoo/soap shelf to the drawing of the shower area.
8. I was surprised Bev plans no window treatment in the shower area. I would have liked something here.
1. Selected exterior housing color
2. Selected exterior lighting fixtures
3. Went over the detailed plans for the children's bath and noted any final changes. We are making sure the soffit is redrawn at the correct height. Additionally, we want to verify the trim in the shower matches the height of the backsplash over the sink. We added an outlet to the new storage area for a radio. We changed the light switch order to first position are the CFL lights(sconces and shower). Second position are the incandescent downlights. The third position is the fan. 4. We reviewed the countertop material. Beverly had a nice composite stone countertop in a color called coffee bean which we will use in place of the marble.
5. We discussed the entry door. We decided to use stained wood and selected a nice stain color.
6. We selected two drawer and door fronts for the cabinetry in the children's bath. Bev with send these cabinets out for bids.
7. We added the shampoo/soap shelf to the drawing of the shower area.
8. I was surprised Bev plans no window treatment in the shower area. I would have liked something here.
Labels:
bath,
cabinetry,
countertop,
decisions,
entry doors,
lighting,
Waiting for the decorator
Wednesday, August 15, 2007
August 15, 2007 Decorator: Guest Bath
Counter selection:"
We moved forward with plans for the guest bath. Bev selected a beautiful stone with golds, browns, and grayish green. She modified the tile to go with it to one which is a little more golden. There is a fabulous accent trim tile which accents the grayish green in the stone.
Cabinet: The cabinet will be painted. The sink will be centerd in the cabinet and this will still allow for ample drawer space on each side of the sink.
Window: The window will be covered with a flat Roman shade.
Bev will be creating a CAD drawing.

We moved forward with plans for the guest bath. Bev selected a beautiful stone with golds, browns, and grayish green. She modified the tile to go with it to one which is a little more golden. There is a fabulous accent trim tile which accents the grayish green in the stone.
Cabinet: The cabinet will be painted. The sink will be centerd in the cabinet and this will still allow for ample drawer space on each side of the sink.
Window: The window will be covered with a flat Roman shade.
Bev will be creating a CAD drawing.
Subscribe to:
Posts (Atom)